The clean between a finished build and a usable building. Cement dust, paint splatter, adhesive residue and protective film — removed without damaging the finishes you have just paid for.

What this covers
What the job actually involves.
Construction dust is not ordinary dust. It is fine, abrasive and everywhere — in the window tracks, on top of the door frames, inside the sockets, settled through the air-conditioning. Cleaned the wrong way it scratches the very surfaces the build was for, which is why a general cleaning crew is the wrong crew for this job.
We work in two stages where the programme allows: a rough clean once the trades are out and the debris can be cleared, then a final handover clean once snagging is finished. On a tight programme we do it in one, but the one-stage version always costs more in labour because the dust settles twice.
Most of this work in Abuja comes to us from developers, facility managers and fit-out contractors handing over to a client with a date in the contract.
Debris and dust clearance
Offcuts, packaging and swept debris removed, then the fine dust taken off every horizontal surface including the ones above eye level.
Paint and adhesive removal
Splatter, overspray, tape residue and protective film taken off glass, tiles, sanitaryware and ironmongery.
Floor scrubbing
Machine-scrubbed where the floor takes it — granite, terrazzo, tile — to lift cement haze rather than smear it.
Glass and frames
Interior and accessible exterior glass polished, with the tracks, frames and beading cleaned out.
Sanitaryware and kitchens
Cement residue off basins, WCs, showers and worktops; cupboards wiped out ready for use.
Final handover inspection
A walk-through with the contractor or facility manager, snag list in hand, before the client ever sees it.
How a job runs
From enquiry to the final walk-through.
- 01
Site visit
We walk the building with you, see what the trades have left, and agree whether it is one stage or two.
- 02
Scope, programme and quote
In writing: areas, stages, crew size, dates and cost, with the handover date you are working to stated on it.
- 03
The clean
Our own machines, consumables and PPE. We work around remaining trades where we have to, and say so if that is costing you quality.
- 04
Handover walk-through
With the contractor or facility manager, against the snag list. Anything flagged is put right before we leave site.
What it costs
What moves the price.
We do not publish a rate card, because a figure that ignores the state of the space would be a guess you could not rely on. These are the things that actually change the number, so you can see what you are being quoted for — ours or anyone else's.
Get an itemised quote- Floor area, and how many levels
- Area is the starting point, but stairs and multiple levels add handling time that a floor-area figure alone misses.
- One stage or two
- A rough clean followed by a final clean costs more in total than a single clean, but each one is faster and the result is better. We will tell you which the programme allows.
- How much residue is left
- The biggest variable by far. Overspray on glass and adhesive on tile are hand work, and there is no fast way to do them without damage.
- Floor and surface types
- A polished granite floor and a textured tile need different machines, pads and chemistry. Delicate finishes mean hand work.
- Programme and access
- Night or weekend work, a tight handover date, a single service lift or no lift at all — each changes the crew size we need to hold the date.
This work, in our own photographs
Jobs we have done.
Questions
What people ask before booking.
Post-construction cleaning enquiries
Give us the handover date.
Tell us the building, the floor area and the date you have to hand over. We will walk the site and come back with the stages, the crew and the cost in writing.
Or reach us directly — 0809 970 0001, WhatsApp, or infodesk@dustandwipes.com.
- Site visit before quoting — this is not a job anyone can price from a floor plan.
- Stages planned around your programme, so nothing is cleaned twice at your expense.
- Handover walk-through against the snag list before we leave site.